Contact

Start with the machine that is costing you the most.

The most useful first conversation is about one machine, one grade portfolio and one measurable problem. Bring a historian extract and we can tell you within a week whether this is worth doing.

Reply in 2 business daysA founder reads itNo drip campaign

run_8f21c4 · agent graph · PM4 10 nodes · 1 approval gate
01 · orchestrator ingest.grade_target ✓ SUCCEEDED 02 · orchestrator twin.simulate ✓ SUCCEEDED 03 · pulp_stock stock.refine ✓ SUCCEEDED 04 · wetend_chem wetend.dose ✓ SUCCEEDED 05 · form_press form.headbox ✓ SUCCEEDED 06 · form_press press.nip ✓ SUCCEEDED 07 · dry_coat dry.steam ✓ SUCCEEDED 08 · defect_inspect inspect.web ✓ SUCCEEDED 09 · orchestrator approve.human ◆ APPROVAL 10 · quality_conf reel.qualify ✓ SUCCEEDED

Live example: Grade change PM4 · 135 gsm kraftliner → 110 gsm testliner, no break, ≤14 min off-spec

Contact

Tell us about your machine

The more specific the machine and the problem, the more useful the first call is. Every field is optional except the ones marked required.

Required.

Required. We reply from a pulpum.com address.

Group name is fine if you prefer.

Helps us bring the right person to the call.

Trim, speed, grades and control platform if you have them to hand.

Required. Off-spec tonnage, break frequency, grade-change time, steam cost, staffing — whatever is actually hurting.

We reply within two business days. No sequence, no drip campaign.

Direct contact

Design partnerships
partners@pulpum.com
Sales and enterprise
sales@pulpum.com
Security and OT review
security@pulpum.com
Careers
careers@pulpum.com
Press
press@pulpum.com

Addresses are provisioned on the pulpum.com business domain. [ASPIRATIONAL — pre-launch]

What happens next

  1. 01We read it

    A founder reads every message. No routing queue.

  2. 02A 30-minute call

    Your machine, your grades, your actual problem.

  3. 03A data review

    A historian extract tells us in a week whether this is worth doing.

  4. 04A written proposal

    Scope, baseline definition and what we will and will not claim.

Reasons

Why people get in touch

Pick whichever is closest and say so in the message.

01

Design partnership

One machine, a defined baseline, a signed reconciliation at the end. A small number of slots remain [ASPIRATIONAL].

02

Enterprise evaluation

A group-level assessment across multiple mills, usually starting with a fleet baseline review.

03

Technical deep dive

Your automation and process engineers versus ours, on architecture, guardrails and failure modes.

04

Security review

Network architecture, data residency, identity, audit and OT segmentation, with documentation supplied in advance.

05

Partnership

Automation vendors, engineering firms, integrators and robotics suppliers who cover mills we do not.

06

A role

Perception, control, simulation, process science and deployment. Tell us what you want to own.

Run timeline

What we would be deploying

The run engine you would be evaluating, shown end to end.

run_8f21c4 PM4 · 6.8 m trim · 1,180 m/min SUCCEEDED
  1. 01 ingest.grade_target SUCCEEDED 0.8 s

    Mill Orchestrator — Pulled the 110 gsm testliner spec, customer tolerances and the standing energy budget from mill MES; locked the target envelope for the run.

  2. 02 twin.simulate SUCCEEDED 34 s

    Mill Orchestrator — Simulated 48 candidate transition recipes on the as-run paper-machine twin — forming, press, dryer and calender — and ranked them on off-spec tonnes, break risk and steam.

  3. 03 stock.refine SUCCEEDED 2 m 10 s

    Pulp-and-Stock — Stepped refiner specific edge load 1.9 → 1.4 Ws/m and pushed freeness toward 412 CSF while consistency held at 3.4%.

  4. 04 wetend.dose SUCCEEDED 1 m 26 s

    Wetend-and-Chemistry — Retention aid trimmed to 214 g/t and sizing to 1.1 kg/t against live charge and turbidity; first-pass retention recovered to 78% inside 90 seconds.

  5. 05 form.headbox SUCCEEDED 1 m 05 s

    Form-and-Press — Re-cut the slice profile across 78 actuators and set jet-to-wire to 0.994 to hold formation index through the basis-weight ramp.

  6. 06 press.nip SUCCEEDED 48 s

    Form-and-Press — Nip load reduced 620 → 540 kN/m to protect the lighter web; post-press dryness landed at 47.1%.

  7. 07 dry.steam SUCCEEDED 3 m 18 s

    Dry-and-Coat — Re-phased the steam schedule across 6 dryer groups and rebalanced the hood; reel moisture converged to 7.4% ±0.19 2σ at 6.1% less steam than the standing recipe.

  8. 08 inspect.web SUCCEEDED continuous

    Defect-and-Inspect — 18 line-scan cameras streaming; two edge-crack precursors detected at the drive side and cleared by a 40 kN/m nip trim before either propagated.

  9. 09 approve.human APPROVAL 52 s

    Mill Orchestrator — Speed ramp 1,180 → 1,245 m/min exceeded the site autonomy threshold. Held for the machine tender; approved by J. Okonkwo at 04:57:12.

  10. 10 reel.qualify SUCCEEDED 1 m 31 s

    Quality-and-Conformance — Reel R-24188 released: full genealogy written (furnish, chemistry, CD profiles, defect map, operator actions) and checked against grade spec.

First 90 days

What an engagement looks like

Deliberately slow at the start, because the write path deserves it.

  1. Week 0

    A 30-minute call about the machine and the problem, followed by a historian extract request.

  2. Weeks 1–2

    Data review. We tell you what we can see in your own data, including if the answer is that we cannot help.

  3. Weeks 3–6

    Mill-edge install, connectors, tag mapping and scan alignment. Shadow mode from the end of this window.

  1. Weeks 7–10

    Advisory recommendations in the HMI. Acceptance rate is the metric the crew and we both watch.

  2. Weeks 11–13

    Supervised writes on a narrow tag allow-list, expanded only at the crew's request.

  3. Day 90

    Reconciliation against the agreed baseline, signed by both sides, whatever it says.

Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every machine in every mill — with the grade and furnish models kept private to each site.

Talk to sales Enterprise details

  • SSO, SCIM and role-based access down to the tag level
  • Group-wide autonomy policy with per-site override and approval chains
  • Cross-mill benchmarking on broke, breaks, steam and first-pass quality
  • VPC, on-prem and fully air-gapped mill-edge deployment options
  • 99.5% control-plane SLA; edge autonomy survives control-plane loss
  • Dedicated deployment engineer and quarterly model review per site
Pricing

Priced per machine, per mill, per group

Land on one workflow with a measurable baseline. Expand by machine, module and autonomy level. Outcome components available on broke, breaks and energy.

Billing period
Machine $16,000 per paper machine / month · billed monthly

Wet-end, forming and drying control or web inspection for a single machine. For mills validating ROI on the wedge.

  • One machine, one agent module
  • Mill-edge inference node included
  • QCS + DCS read, guarded write
  • Run log, audit trail, reel genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $700k – $9M ACV

Multi-site groups standardising on Pulpum, with custom grade, furnish and tolerance models.

  • Multi-site fleet management
  • Custom grade / furnish / tolerance models
  • Mill edge fleet with air-gapped option
  • Group autonomy policy and approval chains
  • SLAs, SSO/SCIM, dedicated engineer
Contact us
Guardrails

An agent that can move a nip needs a leash

Pulpum writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the mill owns.

  • Bounded action space. Each agent can only write to an explicit tag allow-list, inside per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, shift, grade, interlock state and operator presence are all evaluated before a setpoint moves.
  • Human-in-the-loop gates. Anything above the site threshold — speed ramps, grade releases, safety-adjacent moves — waits for a named approver.
  • Immutable audit log. Append-only, hash-chained, exportable, and retained on the mill's own storage.
  • Hard fallback. Loss of the edge node, the network or the model returns control to the DCS's last known-good state within one scan cycle.
  • Tenant and IP isolation. Furnish recipes, grade models and defect libraries never cross a customer boundary. On-prem deployment available.

Compliance posture

Compliance and certification status
StandardScopeStatus
SOC 2 Type IICloud control plane RUNNING In progress [ASPIRATIONAL]
ISO 27001Company-wide ISMS QUEUED Planned [ASPIRATIONAL]
IEC 62443Mill-edge OT security RUNNING Design-aligned
GDPROperator data SUCCEEDED Compliant
ISO 9001 / FSCQuality + chain of custody records SUCCEEDED Supported

Read the security overview

From the control room

What machine tenders say

Autonomy earns trust one shift at a time. These are design-partner quotes from pilot deployments [ASPIRATIONAL].

"The first thing that convinced the crew wasn't the control — it was the log. You can scroll back and see exactly why it dropped the nip. Nobody argues with a timestamp."

Machine tender · PM4 · Nordkraft Mills

"We had two people who could do a clean 135-to-110 transition. One retired in March. The twin now does the sequencing and the second one supervises it."

Production manager · Aurora Board

"Break prediction was the wedge. Ninety seconds of warning is the difference between a nip trim and four hours of threading."

Process engineer · Ternvik Paper
Integrations

It speaks mill, not cloud

Pulpum reads and writes through the systems already on the floor. No rip-and-replace, no parallel historian, no new HMI to learn.

QCS

Valmet IQ, ABB 800xA QCS, Honeywell Experion MX

Profiles, scans, lab results

DCS

ABB 800xA, Valmet DNA, Honeywell Experion, Siemens PCS 7

Setpoint reads and guarded writes

Web inspection

WIS/WMS line-scan, IR and transmission cameras

Frames, defect maps, break replays

Mill MES

SAP PP/QM, ABB cpmPlus, custom historians

Orders, grades, reel genealogy

Historian

OSIsoft PI, Aspen IP.21, InfluxDB

Time-series backfill and replay

Robotics

NVIDIA Isaac, winder and wrapper PLCs

Reel, roll and clamp-truck motion

Identity

Azure AD, Okta, on-prem LDAP

SSO, RBAC, named approvers

Edge

NVIDIA Jetson Orin, IGX, on-prem GPU

Sub-100 ms inference at the machine

See all integrations

FAQ

Straight answers

The questions mill managers and process engineers actually ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your site has set. Level 1 is advisory-only: Pulpum recommends and a human enters everything. Most mills spend their first weeks there before enabling supervised writes.

Get started

Or just send the extract

Twelve weeks of QCS and DCS history from one machine tells us more than any meeting.